Now that we have the lumber for the walls we are begining to put them up. We are starting on the bathroom first. The walls in the house are 12 feet tall, but in this bathroom they are only 8 feet tall, so we have about 3 and a half feet of storage above.
Kyle has been helping for the last few weeks, here he is setting the joists for the bathroom ceiling and storage floor.
Here will be the curved wall in the master bedroom, but in the bathroom, it will be a square corner. Thats why it looks cobbled together, once the drywall is on, you'll never know.
Now that the walls are inplace I can start working on finishing the plumbing. Need to run the sewer vents and connect them before they go out the roof. And I am getting the potable water system in as well. There will be a point of use hot water heater in the bathroom closet. And then set the toilet, sink and tub.
Mary has been busy staining the wood for the ceiling, the wood is pine, with a Minwax - Pecan Gloss stain.