Tons of progress today.
The roof is completely sheeted, and the septic system is going in.
The 1500 gallon septic tank, the field will go out to where the farthest guy is standing, three rows of chambers across more pics of them tomorrow.
Here is the trench on the inside for the sewerlines.
Here is where the sewer lines exit the house and enter into the tank. (Which in this picture the tank hasnt been dropped in.)
An inside look at the living dining and kitchen, note the roof.
I climbed the neighbors hill and took a pic down into our valley. And a nice shot of the greenhouse too.
An end shot of the house looking towards the bedrooms. Note the black loops, those are the chambers for the septic field. Also note the finished roof...ok so not finished, but it is sheeted completely.
And a pic from the valley up to the house and the hill behind from where the other pic was taken.
And a pic of the kitchen end and utility room, the big gapping hole under the small roof, will be blocked up awaiting the garage, then it will become part of a connecting walkway forming the south side of an enclosed courtyard.