Finally started on the house site, they need to raise the ground level from 1 foot up to 5 feet in some areas. They are going to swipe soil from one hill near the driveway to build the hill for the house. These pictures are showing the sod being cleared to one side to be put back when it is all done.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment